BRING SHIP FROM PORT CONDITION TO MANOEUVRING CONDITION
BRING SHIP FROM PORT CONDITION TO MANOEUVRING CONDITION
1. PORT CONDITION
|
2. (a) ONE DIESEL GENERATOR IN USE
(b) OTHER DIESEL GENERATORS ON STANDBY
(c) EMERGENCY GENERATOR ON STANDBY
(d) BOILER AND STEAM SYSTEM IN USE
(e) DIESEL GENERATOR RUNNING ON HFO
(f) M/E JCW SYSTEM IN WARM CONDITION
(g) M/E CIRCULATING WITH HFO
|
3. START LO PURIFIER
|
4. CHECK TELEGRAPH AND ENGINE ROOM CONTROL
|
5. (a) START M/E LUB OIL PUMP
(b) HEAT SUMP IF REQUIRED
|
6. START CROSSHEAD AND TURBOCHARGER LUB OIL PUMP (IF PROVIDED ON BOARD)
|
7. ENSURE CYLINDER OIL MEASURING TANK IS FULL
|
8. START ANOTHER GENERATOR AND RUN IN PARALLEL
|
9. (a) START STEERING MOTORS
(b) CARRY OUT STEERING TESTS
|
10. START THRUSTER UNITS AND CARRY OUT TESTS
|
11. (a) OBTAIN CLEARANCE FROM BRIDGE AND TURN THE M/E
(b) DISENGAGE TURNING GEAR
|
12. PUT STARTING AIR SYSTEM INTO USE
|
13. SUPPLY STARTING AIR AND CONTROL AIR TO M/E
|
14. START AUX BLOWERS AND SWITCH TO AUTO
|
15. OBTAIN CLEARANCE FROM BRIDGE AND BLOW THROUGH THE M/E
|
16. (a) CLOSE INDICATOR COCKS
(b) CLOSE TURBOCHARGER DRAINS
|
17. ENSURE ALL PUMPS ARE STANDBY
|
18. GIVE CONTROLS TO BRIDGE
|
19. PLANT IS NOW IN MANOEUVRING CONDITION
|

Comments
Post a Comment